Supply intake water from the Bago River to the complex
Discharge wastewater from the complex after it is purified by installed wastewater treatment plants to meet water quality standards
Install waste landfill and waste-to-energy incineration plants in the complex to make waste to energy
Taking from the existing Yangon-Mandalay Power Transmission Line to lead its power line to a substation in the complex
COPYRIGHT © 2016 KOREA INDUSTRIAL COMPLEX CO., LTD., ALL RIGHTS RESERVED Admin Privacy Policy